PA0GRI's pictures of the rebuild of DatArena 109 in Muenchen
photo 1 - 713 terminal with build-in Xerox 820 board
photo 2 - Taking the (old) floor apart
photo 3 - The 960 and 4680 parked
photo 4 - Start of the Cyber island build
photo 5 - The new power distribution boxes
photo 6 - The dinosour Cray
photo 7 - Back plane of the Cyber 860 CPU
photo 8 - Front of the Cyber 860 CPU
photo 9 - Condenser unit for Cray C94 or T3D
photo 10 - Progress on the Cyber island
photo 11 - Again, the parked Cyber 960
photo 12 - Framework layed down of Cyber island
photo 13 - Old floor almost gone
photo 14 - Joachim bringing pieces of the floor to the new location
photo 15 - Half way done
photo 16 - And complete
photo 17 - Bucket was the marker where the corner should be
photo 18 - Still some finishing work to do
photo 19 - Kaypro 10 running FSE on NOS (adm3a and 300 baud)
photo 20 - Kaypro 10 on the DI connected to DtCyber
photo 21 - First tape drives on the floor
photo 22 - And the 960 next
photo 23 - Filling up floor space
photo 24 - Next is the construction of the Super island
photo 25 - Done with all the tiles I had
photo 26 - Look from the ramp side
photo 27 - 960 put together
photo 28 - Cray on the move
photo 29 - Overview Cyber island
photo 30 - Overview Super island with the Cray wall
photo 31 - Other side overview Super island
photo 32 - Other side overview Cyber island
photo 33 - Power cables (left of the ramp the 400Hz cables)
photo 34 - DI cabinet with DI and disk emulators
photo 35 Cyber 960 and 930
photo 36 - I/O area - punch is missing
photo 37 - Adding CEE connectors to power cables
photo 38 - More CEE connectors
photo 39 - 3 Phase and single phase 32Amp
photo 40 - Peter in his man hole
photo 41 - Birds eye of the new islands
photo 42 - And the old space is clean
photo 43 - Top down look Cyber island
photo 44 - and in the far distance the Super island
For further information or problems please contact:
Gerard PA0GRI: